A number of factors influence the costs for extending electric service for remodels and new construction.
The distance between where the meter will be on your home and the closest connection to the electric grid.
How power lines are - or likely will be - run from your home to the electric grid.
What type of electric facility (transformer, padmount) you will be connecting to on the electric grid.
Measure along an accessible path that you suspect the power lines would be constructed.
60' or less to nearest PGE transformer
Short overhead service connected to existing pole top PGE transformer.
Cost covered under PGE Line Extension Allowance.
Short underground connected to existing pole top PGE transformer.
Cost covered under PGE Line Extension Allowance.
Short underground connected to existing underground PGE transformer.
Cost covered under PGE Line Extension Allowance.
200' or less to nearest PGE facility (that is not a transformer)
Short overhead service will need PGE pole top transformer installed.
Short underground will need PGE pole top transformer installed.
Short underground service will need PGE underground transformer installed.
201' - 400' to nearest PGE facility
Overhead service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed. Connects to an underground primary source.
401' - 800' to nearest PGE facility
Overhead service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed. Connects to an underground primary source.
801' - 1,000' to nearest PGE facility
Overhead service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed. Connects to an underground primary source.
1,001' - 2,560' to nearest PGE facility
Overhead service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, a pole top transformer and multiple utility poles installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed.
Underground service. Will need high voltage and low voltage wire, additional wire splicing and an underground transformer installed. Connects to an underground primary source.
Sign in to PowerPartner to create a request, view status of your in-progress projects and communicate with your project manager. Haven’t signed up for PowerPartner yet? Create an account.